Description of Figure
3-8. Richmond Trouble Report Form
This figure is a picture of the trouble report form used by the Richmond
Smart Traffic Center. The software CM plan for the STC requires that this
form be filled out when a system user identifies a problem or to recommend
enhancements. This form requires information about the nature of the change
request, such as reasons and subsystems that the change may involve.
|