6.2 Track 1: Optimize Existing ITS
The projects identified in this section are intended to enhance the ITS infrastructure
that is already in place. They include ITS on freeways, traffic signals on
key arterials and optimizing information gathered at ARTIMIS by transmitting
it via information kiosks. These projects are illustrated in Figures 6-1A
and 6-1B. The following nine projects were identified, which will optimize
the current ITS that is already in place:
- Enhance Existing ARTIMIS Field Devices (shown on Figures 6-1A and 6-1B)
- Arterial Signal Operations Upgrades (shown on Figures 6-1A and 6-1B)
- Information Kiosks (e.g. airports, stadiums) (shown on Figures 6-1A and 6-1B)
- Coordinated Emergency Responder Radio System
- Regional Incident Management Forum
- Public Information Program
- Increase Service Patrols
- Freeway Incident Response Teams
- Expand Traveler Information Delivery Methods
The tables following Figures 6-1A and 6-1B provide additional detail on the
projects in Track 1.
Figure 6-1A. Track 1: Optimize Existing
ITS (Ohio)
Figure 6-1B. Track 1: Optimize Existing
ITS (Kentucky)
TRACK 1: OPTIMIZE
Project 1: Enhance Existing ARTIMIS Field Devices
PROJECT |
DESCRIPTION |
CAPITAL COST ESTIMATE |
0
– 6 YEARS |
7
– 10 YEARS |
0
– 6 YEARS |
7
– 10 YEARS |
Kentucky Enhance Existing ARTIMIS Field Devices |
Enhance previously installed field devices are the proper type and in
the proper location through new installations, device change-out or device
relocation. Upgrade communications as needed. |
Implement |
|
$130,000 |
* |
Ohio Enhance Existing ARTIMIS Field Devices |
Enhance previously installed field devices are the proper type and in
the proper location through new installations, device change-out or device
relocation. Upgrade communications as needed. |
Implement |
|
$1,100,000 |
|
Please see Table 6-3
for a complete list of ITS needs. This project’s primary function will
significantly address the following ITS needs:
2. Better management of congestion caused by incidents on freeways and major arterials
3. Alleviate peak hour traffic congestion
5. Reduce the length of time that crashes block roadways
7. Apply lessons learned from current ITS applications to maximize the benefits of existing systems
8. Lack of means to create a current picture of the regional transportation network
TRACK 1: OPTIMIZE
Project 2: Arterial Signal Operations Upgrades (Part 2 - Ohio)
PROJECT |
DESCRIPTION |
CAPITAL COST ESTIMATE |
0 – 6 YEARS |
7 – 10 YEARS |
0 – 6 YEARS |
7 – 10 YEARS |
Ohio Arterial Signal Operations Upgrades |
Study corridor for potential improvements in signal progression, detection,
DMS and CCTV placement |
|
|
|
|
Ohio Arterial Signal Operations Upgrades |
- U.S. 27: U.S.
50 to I-275
|
Study |
|
$460,000* |
|
Ohio Arterial Signal Operations Upgrades |
- U.S. 27: U.S.
50 to I-275
|
|
Implement |
$2,740,000* |
|
Ohio Arterial Signal Operations Upgrades |
- U.S. 22: Eden Park
to Fields Ertel Rd. (Warren County Line)
|
Study |
|
$650,000* |
|
Ohio Arterial Signal Operations Upgrades |
- U.S. 22: Eden Park
to Fields Ertel Rd. (Warren County Line)
|
|
Implement |
$3,880,000* |
|
Ohio Arterial Signal Operations Upgrades |
- U.S. 42: Liberty
St. to I-275
|
Study |
|
$540,000* |
|
Ohio Arterial Signal Operations Upgrades |
- U.S. 42: Liberty
St. to I-275
|
|
Implement |
$3,200,000* |
|
Ohio Arterial Signal Operations Upgrades |
- U.S. 127: SR
126 to I-275
|
Study |
|
$190,000* |
|
Ohio Arterial Signal Operations Upgrades |
- U.S. 127: SR
126 to I-275
|
|
Implement |
|
$1,140,000* |
Ohio Arterial Signal Operations Upgrades |
- U.S. 50: I-75
to Anderson Ferry Road
|
|
Study |
|
$270,000* |
Ohio Arterial Signal Operations Upgrades |
- U.S. 50: I-75
to Anderson Ferry Road
|
|
Implement |
|
$1,600,000* |
Ohio Arterial Signal Operations Upgrades |
|
|
Study |
|
$310,000* |
Ohio Arterial Signal Operations Upgrades |
|
|
Implement |
|
$1,830,000* |
Ohio Arterial Signal Operations Upgrades |
- SR 4: I-275
to SR 4 Bypass
|
|
Study |
|
$120,000* |
Ohio Arterial Signal Operations Upgrades |
- SR 4: I-275
to SR 4 Bypass
|
|
Implement |
|
$690,000* |
Ohio Arterial Signal Operations Upgrades |
- U.S. 50: SR
125 to U.S. 127
|
|
Study |
|
$270,000* |
Ohio Arterial Signal Operations Upgrades |
- U.S. 50: SR
125 to U.S. 127
|
|
Implement |
|
$1,600,000* |
NOTE: Items marked
with an asterisk (*) indicate that the costs are highly uncertain. Further
study is needed to better establish cost estimates. |
TRACK 1: OPTIMIZE
Project 3: Install Information Kiosks (Airport, Stadiums, etc.)
PROJECT |
DESCRIPTION |
CAPITAL COST ESTIMATE |
0 – 6 YEARS |
7 – 10 YEARS |
0 – 6 YEARS |
7 – 10 YEARS |
Kentucky Traveler Information Kiosks |
Implement multi-modal traveler information kiosks connected to ARTIMIS
at airport, key work sites, stadiums, etc. |
Implement |
|
$1,250,000
(10 kiosks) |
|
Ohio Traveler Information Kiosks |
Implement multi-modal traveler information kiosks connected to ARTIMIS
at airport, key work sites, stadiums, etc. |
|
Implement |
|
$625,000
(5 kiosks) |
NOTE: Items marked with an asterisk (*)
indicate that the costs are highly uncertain. Further study is needed
to better establish cost estimates. |
Please see Table 6-3 for a complete list of ITS needs. This project’s
primary function will significantly address the following ITS needs:
1. Improve congestion around special event venues before and after events
3. Alleviate peak hour traffic congestion
8. Lack of means to create a current picture of the regional transportation
network
TRACK 1: OPTIMIZE
Project 4: Coordinated Emergency Responder Radio System
PROJECT |
DESCRIPTION |
CAPITAL COST ESTIMATE |
0 – 6 YEARS |
7 – 10 YEARS |
0 – 6 YEARS |
7 – 10 YEARS |
Kentucky Coordinated Emergency Responder Radio System |
Public safety and emergency response operate at a number of different
radio frequencies. This project provides funding to evaluate which functions
served by which communications links should be integrated across jurisdictions.
Budget is included to implement the upgraded, integrated communications
systems to enable interagency communications in the field. |
Study and Implement |
|
$2,200,000* |
|
Ohio Coordinated Emergency Responder Radio System |
Public safety and emergency response operate at a number of different
radio frequencies. This project provides funding to evaluate which functions
served by which communications links should be integrated across jurisdictions.
Budget is included to implement the upgraded, integrated communications
systems to enable interagency communications in the field. |
Study and Implement |
|
$2,200,000* |
|
NOTE: Items marked
with an asterisk (*) indicate that the costs are highly uncertain. Further
study is needed to better establish cost estimates. |
Please see Table 6-3 for a complete list of ITS needs. This project’s
primary function will significantly address the following ITS needs:
2. Better management of congestion caused by incidents on freeways and
major arterials
3. Alleviate peak hour traffic congestion
5. Reduce the length of time that crashes block roadways
8. Lack of means to create a current picture of the regional transportation
network
TRACK 1: OPTIMIZE
Project 5: Regional Incident Management Forum
PROJECT |
DESCRIPTION |
CAPITAL COST ESTIMATE |
0 – 6 YEARS |
7 – 10 YEARS |
0 – 6 YEARS |
7 – 10 YEARS |
Kentucky Establish Regional Incident Management Forum |
Fund activities related to regional incident management forum. The suggested
charter of the forum is standardizing, unifying and improving response
to crashes and other incidents on the roadways. Expands on current incident
Management Task Force of OKI. |
Implement |
Implement |
$150,000
($25,000 per year) |
$100,000
($25,000 per year) |
Ohio Establish Regional Incident Management Forum |
Fund activities related to regional incident management forum. The suggested
charter of the forum is standardizing, unifying and improving response
to crashes and other incidents on the roadways. Expands on current incident
Management Task Force of OKI. |
Implement |
Implement |
$150,000
($25,000 per year) |
$100,000
($25,000 per year) |
Please see Table 6-3 for a complete list of ITS needs. This project’s
primary function will significantly address the following ITS needs:
2. Better management of congestion caused by incidents on freeways
and major arterials
3. Alleviate peak hour traffic congestion
5. Reduce the length of time that crashes block roadways
8. Lack of means to create a current picture of the regional transportation
network
TRACK 1: OPTIMIZE
Project 6: Public Information Program
PROJECT |
DESCRIPTION |
CAPITAL COST ESTIMATE |
0 – 6 YEARS |
7 – 10 YEARS |
0 – 6 YEARS |
7 – 10 YEARS |
Kentucky Public Information Program |
Publicize ARTIMIS services, educate public on how to use the services,
inform public of what to do when there is a crash. |
Implement |
Implement |
$600,000
($100,000 per year) |
$400,000
($100,000 per year) |
Ohio Public Information Program |
Publicize ARTIMIS services, educate public on how to use the services,
inform public of what to do when there is a crash. |
Implement |
Implement |
$600,000
($100,000 per year) |
$400,000
($100,000 per year) |
Please see Table 6-3 for a complete list of ITS needs. This project’s
primary function will significantly address the following ITS needs:
1. Improve congestion around special event venues before and after
events
2. Better management of congestion caused by incidents on freeways and major
arterials
3. Alleviate peak hour traffic congestion
5. Reduce the length of time that crashes block roadways
8. Lack of means to create a current picture of the regional transportation
network
TRACK 1: OPTIMIZE Project 7: Increase Service Patrol
PROJECT |
DESCRIPTION |
CAPITAL COST ESTIMATE |
0 – 6 YEARS |
7 – 10 YEARS |
0 – 6 YEARS |
7 – 10 YEARS |
Kentucky Increase Freeway Service Patrols |
Increase frequency on existing routes, and expand geographic
coverage. Purchase additional service patrol vehicles |
Implement two additional vehicles |
|
$250,000 |
|
|
Implement two additional vehicles |
|
$250,000 |
Ohio Increase Freeway Service Patrols |
Increase frequency on existing routes, and expand geographic
coverage. Purchase additional service patrol vehicles |
Implement five additional vehicles |
|
$625,000 |
|
|
Implement three additional vehicles |
|
$375,000 |
Please see Table 6-3 for a complete list of ITS needs. This project’s
primary function will significantly address the following ITS needs:
2. Better management of congestion caused by incidents on freeways
and major arterials
3. Alleviate peak hour traffic congestion
5. Reduce the length of time that crashes block roadways
8. Lack of means to create a current picture of the regional transportation
network
TRACK 1: OPTIMIZE
Project 8: Freeway Incident Response Teams
PROJECT |
DESCRIPTION |
CAPITAL COST ESTIMATE |
0 – 6 YEARS |
7 – 10 YEARS |
0 – 6 YEARS |
7 – 10 YEARS |
Kentucky Freeway Incident Response Teams |
Implement incident response to attend to and remove disabled vehicles
from interstates. |
Implement four vehicles |
Implement two more vehicles |
$600,000 |
$300,000 |
Ohio Freeway Incident Response Teams |
Implement incident response to attend to and remove disabled vehicles
from interstates. |
Implement ten vehicles |
Implement four more vehicles |
$1,500,000 |
$600,000 |
Please see Table 6-3 for a complete list of ITS needs. This project’s
primary function will significantly address the following ITS needs:
2. Better management of congestion caused by incidents on freeways and major arterials
3. Alleviate peak hour traffic congestion
5. Reduce the length of time that crashes block roadways
8. Lack of means to create a current picture of the regional transportation network
TRACK 1: OPTIMIZE Project 9: Expand Traveler Information Delivery Methods
PROJECT |
DESCRIPTION |
CAPITAL COST ESTIMATE |
0 – 6 YEARS |
7 – 10 YEARS |
0 – 6 YEARS |
7 – 10 YEARS |
Kentucky Expand Traveler Information Delivery Methods |
Implement additional traveler information dissemination methods which
may include cable TV station; personalized traveler information on a subscription
basis delivered to cell phones, pagers, personal computing devices, etc.;
connections to private sector service providers that provide content for
in-vehicle computing devices; and other means that may emerge in the future.
This should be implemented via a public-private partnership. The key public
sector cost element will be in infrastructure to enable providing enhanced
content to the private sector. |
Implement |
Implement |
$1,000,000* |
$750,000* |
Ohio Expand Traveler Information Delivery Methods |
Implement additional traveler information dissemination methods which
may include cable TV station; personalized traveler information on a subscription
basis delivered to cell phones, pagers, personal computing devices, etc.;
connections to private sector service providers that provide content for
in-vehicle computing devices; and other means that may emerge in the future.
This should be implemented via a public-private partnership. The key public
sector cost element will be in infrastructure to enable providing enhanced
content to the private sector. |
Implement |
Implement |
$1,000,000* |
$750,000* |
NOTE: Items marked
with an asterisk (*) indicate that the costs are highly uncertain. Further
study is needed to better establish cost estimates. |
Please see Table 6-3 for a complete list of ITS needs. This project’s
primary function will significantly address the following ITS needs:
1. Improve congestion around special event venues before and after events
2. Better management of congestion caused by incidents on freeways and major arterials
3. Alleviate peak hour traffic congestion
5. Reduce the length of time that crashes block roadways
8. Lack of means to create a current picture of the regional transportation network
previous page | next page
|