Tolling and Pricing Program - Links to Tolling and Pricing Program Home

Michigan (1 facility)

Michigan Table 1: Geographic and Infrastructure Characteristics  (NA is not available)
ID Location Agency History Scale Type Separation
Urban Area Road Segment Year Opened Current Status # of Lanes (GP/ HOV) Length
(Lane-Miles/
Route-Miles)
134 Detroit I-75 M-102 to M-59 Michigan DOT In planning & design ROD received; engineering report 2006; design defer 3 / 1 72.0 / 36.0 Concurrent (median) Painted stripe

 

Michigan Table 2: Policy and Utilization Characteristics (NA is not available)
ID Location Eligibility Days/Hours of Operation Inter-mediate Access Allowed Utilization Peak Hour Violation Estimate Peak Hour Travel Time Savings (minutes)
Urban Area Road Segment HOV Eligibility Special Fuel Eligibility AM Peak Hour Utilization (persons, vehicles, % of total vehicles) PM Peak Hour Utilization (persons, vehicles, % of total vehicles)
134 Detroit I-75 M-102 to M-59 Yes In discussion Peak hours; tentatively 7 to 9 AM, 4 to 6 PM Yes NA NA NA NA
Previous | Next

December 2008
FHWA-HOP-09-030