Traffic Signal Management Plans
Printable Version [PDF, 4.8 MB]
You may need the AdobeĀ® ReaderĀ® to view the PDFs on this page.
Contact Information: Operations Feedback at OperationsFeedback@dot.gov

U.S. Department of Transportation
Federal Highway Administration
Office of Operations
1200 New Jersey Avenue, SE
Washington, DC 20590
FHWA-HOP-15-038
November 2015
An Objectives- and Performance-based Approach for Improving the Design Operations and Maintenance of Traffic Signal Systems
Table of Contents
[ Technical Report Documentation Page ] [ Notices ] [ SI* (Modern Metric) Conversion Factors ]
List of Figures
| Figure 1. Graphic. Would a traffic signal management plan be helpful for my agency? |
| Figure 2. Graphic. Relationships among agency documents |
| Figure 3. Graphic. Good basic service components |
| Figure 4. Graphic. Notable interactions needed to achieve good basic service. |
| Figure 5. Graphic. Goals, context, objectives, strategies, and tactics (GOST) pyramid. |
| Figure 6. Diagram. Planner and operator approaches to traffic signal management planning. |
| Figure 7. Diagram. Planner vs. operator goals, context, objectives, strategies, and tactics (GOST) perspective. |
| Figure 8. Diagram. Traffic signal management plan development flow chart |
| Figure 9. Diagram. Traffic signal management plan context diagram. |
| Figure 10. Diagram. High-level system concept diagram. |
| Figure 11. Map. Distribution of MAC Address Readers in Mesa, Arizona. |
| Figure 12. Map. Location of Ygnacio Valley Road, Walnut Creek. |
| Figure 13. Chart. Illustration of demand variation on Ygnacio Valley Road. |
| Figure 14. Chart. Sample analysis using Bluetooth and traffic volume data |
| Figure 15. Graph. Sample BlueToad™ travel time report for Ygnacio Valley Road |
| Figure 16. Diagram. Sample Purdue Coordination Diagram. |
| Figure 17. Diagram. Corridor arrival on green report. |
| Figure 18. Graph. Using arrivals on green for optimization of offsets. |
| Figure 19. Graph. Termination monitor report. |
| Figure 20. Graph. Split monitor report. |
| Figure 21. Graph. Phase termination by max-out at night. |
| Figure 22. Graph. Split monitor helped identify problem. |
| Figure 23. Graph. Split monitor shows problem cleared. |
List of Tables