The Microsoft Word version of this checklist is an editable form that can be used to support process reviews.
Process Checklist | ||||
Are all the bases covered? | Yes | No | Not Applicable | Comments |
For project scoping studies: | ||||
Is there a validated statement of vision, goals, and objectives? | ||||
Have constraints been collected from all key stakeholders? | ||||
Have the evaluation criteria in comparing alternatives been selected, validated, and documented? | ||||
Is there a comprehensive list of candidate solutions, both technical and procedural? | ||||
Is there a comprehensive and varied list of alternative concepts? | ||||
Is the "Do Nothing" case one of the alternatives? | ||||
Has the comparison approach been documented and validated? | ||||
Has the selected concept, and the rationale for its selection, been documented; and has it been reviewed by the stakeholders? | ||||
Does the documentation satisfy relevant reporting standards, if any, for example, for a Study Report if required by the state? | ||||
Do the conclusions and recommendations flow in a clear and defensible manner from the needs, alternatives selection, and analysis? | ||||
For Programming (of ITS projects): | ||||
Are ITS projects identified in the TIP (or STIP) project list? | ||||
Have regional TIP requirements been addressed in creating the information for each project (including identification of ITS aspects of project if that is a part of the requirements | ||||
Has relevant information from the regional ITS architecture been included in the project information in the TIP (if this is one of the regional requirements)? | ||||
Are capital projects that include ITS elements identified in the project list? |