Figure 5. Results for Project Construction and Operation Section
The data shown in figure 5 are provided in the table below.
Section | 2010 | 2011 |
---|---|---|
4.4.1 | 9.9 | 10.2 |
4.4.2 | 10.7 | 11.0 |
4.4.3 | 11.2 | 11.6 |
4.4.4 | 7.4 | 7.8 |
4.4.5 | 11 | 11.2 |
4.4.6 | 10.5 | 10.6 |
4.4.7 | 13.2 | 13.3 |
4.4.8 | 12.4 | 12.6 |
4.4.9 | 8.3 | 8.8 |