Work Zone Mobility and Safety Program

Work Zone Road User Costs - Concepts and Applications

References

  1. AASHTO, A Practical Guide to Estimating, Prepared by AASHTO Technical Committee on Cost Estimating, American Association of State Highway and Transportation Officials, Washington, DC, 2009.
  2. Alam, M., E. Fekpe and M. Majed, FAF2 Freight Traffic Analysis, Submitted to FHWA Office of Freight Management and Operations, 2007.
  3. Alam, M., G. Rajamanickam, Development of Truck Payload Equivalent Factor, Submitted to FHWA Office of Freight Management and Operations, 2007.
  4. Alder, R. UDOT Construction Manager General Contract (CMGC) Annual Report, Utah Department of Transportation Project Development Group, Engineering Services and Bridge Design Section, Salt Lake City Utah, 2007, 39pp.
  5. Alexiadis, V., K. Jeannotte and A. Chandra, Traffic Analysis Toolbox Volume I: Traffic Analysis Tools Primer, Report No. FHWA-HRT-04-038, Office of Operations, Federal Highway Administration, Washington, DC, 2004.
  6. Al-Kaisy, A. and F. Hall, “Guidelines for Estimating Freeway Capacity at Long-Term Reconstruction Zones,” CDROM Compendium, Proceedings of 81th Annual Meeting, Transportation Research Board, Washington, DC, 2002.
  7. American Automobile Association, Your Driving Costs.
  8. Anderson, S., I. Damnjanovic, A. Nejat and S. Ramesh, Synthesis on Construction Unit Cost Development: Technical Report, Report No. FHWA/TX-09/0-6023-1, Texas Department of Transportation, Austin, Texas, 2008.
  9. Anderson, S. D. and I. Damnjanovic, Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion, NCHRP Synthesis 379, National Cooperative Highway Research Program, Transportation Research Board, Washington, D.C., 2008.
  10. Antonucci, N. D., K. K. Hardy, J. E. Bryden, T. R. Neuman, R. Pfefer and K. Slack, Guidance for Implementation of the AASHTO Strategic Highway Safety Plan Volume17: A Guide for Reducing Work Zone Collisions, NCHRP Report 500, National Cooperative Highway Research Program, Transportation Research Board, Washington, D.C. 2005.
  11. Barnes and Langworthy, The Per-Mile Costs of Operating Automobiles And Trucks, Report No. MN/RC 2003-19, Submitted to Minnesota Department of Transportation, St. Paul, Mn, 2004.
  12. Barth, M., F.An, T. Younglove, G. Scora, C. Levine, M. Ross and T. Wenzel, Development of a Comprehensive Modal Emissions Model, Final Report, NCHRP Project 25-11, National Cooperative Highway Research Program, Transportation Research Board, Washington DC, 2000.
  13. Bein, P. and D.C. Biggs, “Critique of Texas Research and Development Foundation Vehicle Operating Cost Model,” Transportation Research Record No.1395, Journal of the Transportation Research Board, Washington, DC, 1993.
  14. Benekohal, R. F. A. Kaja-Mohideen, M. V. Chitturi, “A Methodology for Estimating Operating Speed and Capacity in Work Zones,” Transportation Research Record No. 1883, Journal of the Transportation Research Board, Washington, DC, 2004.
  15. Bourne, J. S. et al, Best Practices In Work Zone Assessment, Data Collection, and Performance Evaluation, NCHRP Project 20-68A Scan 08-04, National Cooperative Highway Research Program, Transportation Research Board, Washington, DC, 2010.
  16. Caltrans, California Life-Cycle Benefit/Cost Analysis Model (Cal-B/C) Technical Supplement to User’s Guide, Prepared by Booz Allen & Hamilton Inc., California Department of Transportation, Sacramento, 1999.
  17. Caputo, F. and S. Scott, Criteria and Guidelines for Innovative Contracting, Final Report, Study No. SD95-07, Submitted to the South Dakota Department of Transportation, Pierre, SD, 1996.
  18. Carr, P. G. and P. S. Beyor, "Design Fees, the State of the Profession, and a Time for Corrective Action,” Journal of Management in Engineering, American Society of Civil Engineering, Vol. 21, No. 3, July 1, 2005.
  19. Claffey, P. J., Running Costs of Motor Vehicles as affected by Road Design and Traffic, National Cooperative Highway Research Program Report 111, Transportation Research Board, Washington, DC, 1971.
  20. Council et al., Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries, Report No. FHWA-HRT-05-051), Submitted to the Office of Safety Research and Development, Federal Highway Administration, Washington, 2005.
  21. Crossett, J. and Hines, Comparing State Dots’ Construction Project Cost & Schedule Performance –28 Best Practices from 9 States, Final Report, NCHRP Project 20-24, Task 37A, National Cooperative Highway Research Program, Transportation Research Board, Washington, D.C., 2007.
  22. Curry and Anderson, Procedures for Estimating Highway User Costs, Air Pollution, and Noise Effects, National Cooperative Highway Research Program Report 133, Transportation Research Board, Washington, DC, 1972.
  23. Daniels, C. Vehicle Operating Costs in Transportation Studies, E.S.U. Technical Series, No. 1, Spencer House, London (1974).
  24. DeNavas-Walt, C., B. D. Proctor, J. C. Smith, Income, Poverty, and Health Insurance Coverage in the United States: 2009, Report No. P60-238, US Census Bureau, September 2010.
  25. Dixon, K. K., J. E. Hummer, J. E. and A. R. Lorscheider, “Capacity for North Carolina Freeway Work Zones,” Transportation Research Record No. 1529, Journal of the Transportation Research Board, Washington, D.C., 1996.
  26. Dudek, C. L. and S. H. Richards, Traffic Capacity through Work Zones on Urban Freeways, Report FHWA/TX-81/228-6, Texas Department of Transportation, Austin, TX, 1981.
  27. Edara, P., Estimation of Traffic Impacts at Work Zones: State of the Practice, Report No. VTRC 06-R25, Virginia Department of Transportation, Richmond, VA, 2006.
  28. Eisele, B., Schrank, D. and T. Lomax, 2011 Congested Corridors Report - Appendix B, Texas Transportation Institute, College Station, TX, 2011.
  29. Ellis, R., J. Pyeon, Z. Herbsman, E. Minchin and K. Molenaar, Evaluation of Alternative Contracting Techniques on Florida DOT Construction Projects, Final Report, Contract No. FDOT BDC51, Submitted to the Florida Department of Transportation, Gainesville, 2007.
  30. EPA, Technical Guidance on the Use of MOVES2010 for Emission Inventory Preparation in State Implementation Plans and Transportation Conformity, Report No. EPA-420-B-10-023, Office of Transportation and Air Quality, United States Environmental Protection Agency, April, 2010.
  31. FHWA, Contract Administration Core Curriculum Participant’s Manual and Reference Guide, Office of Program Administration, Federal Highway Administration, Washington, D.C., 2006.
  32. FHWA, Decision-Making Framework for Prefabricated Bridge Elements and Systems (PBES), Publication Number FHWA-HIF-06-030, Federal Highway Administration, May 2006.
  33. FHWA, Economic Analysis Primer, Office of Asset Management, Federal Highway Administration, U.S. Department of Transportation, August 2003.
  34. FHWA, Facts and Statistics, Work Zone Mobility and Safety Program, Office of Operations, Federal Highway Administration Washington D.C., 2008.
  35. FHWA, Guide for Construction Contract Time Determination Procedures, Technical Advisory TA 5080.15, Office of Program Administration, Federal Highway Administration, Washington, DC, 2002.
  36. FHWA, Highway Economic Requirements System- State Version, Technical Report, Federal Highway Administration, Washington, DC, 2005.
  37. FHWA, Manual on Use of Self-Propelled Modular Transporters to Move Bridges, Publication No. FHWA-HIF-07-022, Federal Highway Administration, 2007.
  38. FHWA, Modular systems reduce traffic congestion and speed project completion,
  39. FHWA, Motor Vehicle Accident Costs, Technical Advisory T 7570.1, Federal Highway Administration, Washington, DC, 1994.
  40. FHWA, Our Nation's Highways 2010, Publication No. FHWA-PL-10-023, Office of Highway Policy Information, Federal Highway Administration Washington D.C., 2010.
  41. FWHA, Special Experimental Projects No. 14 - Alternative Contracting, Office of Program Administration, Federal Highway Administration, Washington, DC.
  42. FHWA, Work Zone Mobility and Safety Self-Assessment Guide, Office of Operations, Federal Highway Administration, Washington, DC, 2004.
  43. Fick, G., Cackler, E. T., Trost, S. and L. Vanzler, Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts, Final Report, NCHRP Project No. 652, National Cooperative Highway Research Program, Transportation Research Board, Washington, D.C., 2010.
  44. Gransberg, D. and J. S. Shane, Construction Manager-at-Risk Project Delivery for Highway Programs, NCHRP Synthesis 402, National Cooperative Highway Research Program, Transportation Research Board, Washington DC, 2010.
  45. Greenhorne & O’Mara, Inc. Eastern Avenue Over Kenilworth Avenue, N.E. Work Zone Transportation Management Plan, Washington, D.C. Prepared for District Department of Transportation Infrastructure Project Management Administration/Team 4. May 2009.
  46. Hardy, M. and K. Wunderlich, Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation - A Guide for Analyst, Report No. FHWA-HOP- 09-001, Office of Operations, Federal Highway Administration, Washington, DC, 2009.
  47. Hardy, M. and K. Wunderlich, Traffic Analysis Tools Volume VIII: Work Zone Analysis - A Guide for Decision-Makers, Report No. FHWA-HOP-08-029, Office of Operations, Federal Highway Administration, Washington, DC, 2008.
  48. Herbsman, Z. J., W. T. Chen and W. C. Epstein, “Time is Money: Innovative Contracting Methods in Highway Construction,” Journal of Construction Engineering and Management, American Society of Civil Engineering, Vol. 121, No. 3, 1995.
  49. Highway Capacity Manual 2000, Transportation Research Board, Washington, DC, 2000.
  50. Highway Capacity Manual 2010, Transportation Research Board, Washington DC, 2010.
  51. Highways for LIFE, Performance Contracting Framework, Prepared by Science Applications International Corporation, Federal Highway Administration, Washington, DC, 2006.
  52. Hu, P. S. and J. Young, 1990 Nationwide Personal Transportation Survey (NPTS) Databook, Report No. FHWA-PL-94-010A, Prepared by Oak Ridge National Laboratory, Submitted to the Office of Highway Information Management, Federal Highway Administration, Washington, DC, November 1993.
  53. Hu, P. S. and T. R. Reuscher, Summary of Travel Trends, 2001 National Household Travel Survey, Prepared by Oak Ridge National Laboratory, Submitted to the Federal Highway Administration, Washington, DC, November 2004.
  54. Jaraiedi, M., R. W. Plummer, M. S. Aber, “Incentive/Disincentive Guidelines for Highway Construction Contracts”, Journal of Construction Engineering and Management, American Society of Civil Engineering, Vol.121, No. 1, 1995.
  55. Jiang, Y., “Traffic Capacity, Speed and Queue-discharge rate for Indiana’s Four-lane Freeway Work Zones,” Transportation Research Record No. 1657, Journal of the Transportation Research Board, Washington, D.C.,1999
  56. Jeannotte, K. and A. Chandra, Developing and Implementing Transportation Management Plans for Work Zones, Report No. FHWA-HOP-05-066, Office of Transportation Operations, Federal Highway Administration, Washington, DC, 2005.
  57. Kepner, C. H. and B. B. Tregoe, The New Rational Manager, Princeton Research Press, Princeton, NJ, 1981.
  58. Kim, T., D. J. Lovell, and J. Paracha, A New Methodology to Estimate Capacity for Freeway Work Zones, Paper No. 01-0566, CDROM Compendium, Proceedings of 80th Annual Meeting, Transportation Research Board, Washington, DC, 2001.
  59. Krammes, R. A. and G. O. Lopez, Updated Short-Term Freeway Work Zone Lane Closure Capacity Values, Report No. FHWA/TX-92/1108-5, Texas Department of Transportation, Austin, TX, 1992.
  60. Lee, E. B. and C. W. Ibbs, Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies, ASCE Journal of Construction Engineering and Management, Vol. 131, No. 4, 2005.
  61. Lewis, D. L., Road User and Mitigation Costs in Highway Pavement Projects, NCHRP Synthesis 269, National Cooperative Highway Research Program, Transportation Research Board, Washington DC, 1996.
  62. Manual on Uniform Traffic Control Devices for Streets and Highways, 2009 Edition, Federal Highway Administration, Washington, DC, 2009.
  63. McFarland, W. F., J. L. Memmott, M. K. Chui, M. D. Richter and A. Castano-Pardo, MicroBenCOST User Manual, NCHRP Project No 7-12, National Cooperative Highway Research Program, Transportation Research Board, Washington, DC, 1993.
  64. McFarland, W. F., R. J. Kabat, R. A. Krammes, Comparison of Contracting Strategies for Reducing Project Completion Time, Report No. FHWA/TX-94/1310-F, Texas Department of Transportation, Austin, TX, 1994.
  65. Molenaar, K. R. and A. D. Songer, A. D. “Model for Public Sector Design-Build Project Selection,” Journal of Construction Engineering and Management, American Society of Civil Engineering, Vol. 24, Issue 6, 1998.
  66. Mubarak, S. Construction Project Scheduling and Control, Second Edition, John Wiley & Sons, Inc., 2010.
  67. NCDOT, Guidelines for Implementation of the Work Zone Safety and Mobility Policy, Draft, 2007.
  68. Nesamani, K. S., Estimating Vehicle Emissions in Transportation Planning Incorporating the Effect of Network Characteristics on Driving Patterns, Ph.D. Dissertation, University of California, Irvine, 2007.
  69. NHTSA, Final Regulatory Impact Analysis, Corporate Average Fuel Economy for MY 2011 Passenger Cars and Light Trucks, National Highway Traffic Safety Administration, 2009.
  70. NJDOT, Road User Cost Manual, New Jersey Department of Transportation, Trenton, NJ, 2001.
  71. Oak Ridge National Laboratory, 1995 Nationwide Personal Transportation Survey (NPTS) Databook, Report No. ORNL/TM-2001/248, Prepared for FHWA Office of Highway Information Management, Oak Ridge National Laboratory, Oak Ridge, TN, October, 2001.
  72. Occupational Employment Statistics, Published by Bureau of Labor Statistics.
  73. Pal, R., and K. Sinha, An Evaluation of Lane Closure Strategies for Interstate Work Zones, Report No. FHWA/IN/JHRP-95/1, Joint Transportation Research Program, Purdue University, West Lafayette, IN, 1995.
  74. Pyeon, J. H. and E. B. Lee, "CA4PRS Application for Determination of Incentive/Disincentive Dollar Amount," Presented at the CA4PRS Peer Exchange Workshop, St. Louis, MO, 2010.
  75. Reed Construction Data.
  76. RealCost, Life-Cycle Cost Analysis Software, Version 2.5, Office of Asset Management, Federal Highway Administration, Washington, DC.
  77. Saito, M., M. R. Adams, T. G. Jin, Development of a User Cost Estimation Procedure for Work Zones, Report No. UT-05.11, Utah Department of Transportation, Salt Lake City, UT, 2005.
  78. Salem, O. and A. Genaidy, Improved Models for User Costs Analysis, Report No. FHWA/OH-2008/3, Ohio Department of Transportation, Columbus, OH, 2008.
  79. Sankar, P., K. Jeannotte, J. P. Arch, M. Romero, J. E. Bryden, Work Zone Impacts Assessment – An Approach to Assess and Manage Work Zone Safety and Mobility Impacts of Road Projects, Report No. FHWA-HOP-05-068, Office of Operations, Federal Highway Administration, Washington, DC, 2006.
  80. Sarasua, W. A., W. J. Davis, D. B. Clarke, J. Kottapally, P. Mulukutla, “Estimating Interstate Highway Capacity for Short-Term Work Zone Lane Closures: Development of Methodology,” Transportation Research Record No. 1877, Journal of the Transportation Research Board, Washington, D.C., 2004.
  81. See, C. F., S. D. Schrock and K. McClure, “Crash Analysis of Work-Zone Lane Closures with Left-Hand Merge and Downstream Lane Shift”, Paper #09-0979, DVD Compendium, Proceedings of 88th Annual Meeting, Transportation Research Board, Washington, DC, 2009.
  82. Shr, J-F., B .P. Thompson, J. S. Russell, B. Ran and H. P. Tserng, “Determining Minimum Contract Time for Highway Projects,” Transportation Research Record No. 1742, Journal of the Transportation Research Board, Transportation Research Board, Washington, D.C., 2000.
  83. Sillars, D. N. and J. Riedl, “Framework Model for Determining Incentive and Disincentive Amounts,” Transportation Research Record No. 2040, Journal of the Transportation Research Board, Transportation Research Board, Washington, D.C., 2007.
  84. Sillars, S. N. Establishing Guidelines for Incentive/Disincentive Contracting at Oregon DOT, Report No. FHWA-OR-RD-07-07, Oregon Department of Transportation, Salem OR, 2007.
  85. Sinha, K. C., and S. Labi, Transportation Decision Making: Principles of Project Evaluation and Programming, John Wiley & Sons, Inc., 2007.
  86. Thomas, H. R., R. D. Ellis, S. K. Sinha, Improving the Time Performance of Highway Construction Contracts, Final Report, NCHRP Project No. 20-24(12)A, National Cooperative Highway Research Program, Transportation Research Board, Washington, D.C., 2006.
  87. Thompson, M., A. Unnikrishnan, A. J. Conway and C. M. Walton, A Comprehensive Examination of Heavy Vehicle Emission Factors, Report No. SWUTC/10/476660-00067-1, Southwest Region University Transportation Center, College Station, TX, 2010.
  88. Trego, T., and D. Murray, “An Analysis of the Operational Costs of Trucking,” Paper #10-2307, DVD Compendium of Papers of the TRB 89th Annual Meeting, Transportation Research Board, Washington, 2010.
  89. Ullman, G. L., M. D. Finley, J. E. Bryden, R. Srinivasan and F. M. Council, Traffic Safety Evaluation of Nighttime and Daytime Work Zones, NCHRP Report 627, National Cooperative Highway Research Program, Transportation Research Board, Washington, DC, 2008.
  90. Ullman, G. L., R. J. Porter and G. J. Karkee, Monitoring Work Zone Safety and Mobility Impacts in Texas, Report No. FHWA/TX-09/0-5771-1, Submitted to Texas Department of Transportation, Austin, TX, 2009.
  91. USDOT, Valuation of Travel Time in Economic Analysis-Revised Departmental Guidance, Memorandum, Office of the Secretary of Transportation, U.S. Department of Transportation, Washington, DC. 2003.
  92. USDOT, Treatment of the Value of Preventing Fatalities and Injuries in Preparing Economic Analyses-Revised Departmental Guidance, Memorandum, Office of the Secretary of Transportation, U.S. Department of Transportation, Washington, DC. 2009.
  93. Walls III, J. and M. R. Smith, Life-Cycle Cost Analysis in Pavement Design — Interim Technical Bulletin, Report No. FHWA-SA-98-079, Federal Highway Administration, Washington, DC, 1998.
  94. Weng, J. and Q. Meng, “A Decision Tree-based Model for Work Zone Capacity Estimation,” Paper No. 11-0865, DVD Compendium, Proceedings of 90th Annual Meeting, Transportation Research Board, Washington, DC, 2011.
  95. Wildenthal, M. T. and J. L. Buffington, “Estimated Construction Period Impact of Widening State Highway 21, in Caldwell, Texas,” Transportation Research Record No. 1559, Journal of the Transportation Research Board, Washington, D.C., 1996.
  96. Willett, T. O., Incentive/Disincentive (I/D) for Early Completion, Technical Advisory T 5080.10, Federal Highway Administration, dated February 8, 1989.
  97. Winfrey, R., Economic Analysis of Highways, International Textbook Company, Scranton, Pennsylvania, 1969.
  98. Wolffing, C., J. Liesman, R. Young and K. Ksaibati, Highway Construction Related Business Impacts: Phase I Report, Report No. FHWA-WY-04/01F, Wyoming Department of Transportation, Cheyenne, WY, March 2004.
  99. Work Zone Safety Performance Measures Guidance Booklet, Prepared by American Traffic Safety Services Association (ATSSA), Fredericksburg, VA, 2010.
  100. Work Zone Traffic Analysis Strategies Webinar, Recording, FHWA/National Transportation Operations Coalition , July 9, 2008.
  101. Zaniewski, J. P., B. C. Butler, G. Cunningham, G. E. Elkins, M. S. Paggi, and R. Machemehl. Vehicle Operating Costs, Fuel Consumption and Pavement type and Condition Factors, Final Report # DOT-FH-11-9678, Prepared by Texas Research and Development Foundation, Federal Highway Administration, Washington, DC, 1982.

You will need the Adobe Reader to view the PDFs on this page.

previous | next
Office of Operations