A Case Study
Work Zone Traffic and Incident Management System
Keeping Traffic Moving During Reconstruction of the Big I,
a Major Interstate-Interstate Interchange in Albuquerque
January 2004
Notice
The Federal Highway Administration provides high-quality information
to serve Government, industry, and the public in a manner that promotes
public understanding. Standards and policies are used to ensure
and maximize the quality, objectivity, utility, and integrity of
its information. FHWA periodically reviews quality issues and adjusts
its programs and processes to ensure continuous quality improvement.
Foreword
Dear Reader,
We have scanned the country and brought together the collective wisdom
and expertise of transportation experts implementing Intelligent Transportation
Systems (ITS) projects across the United States. This information will
prove helpful as you set out to plan, design, and deploy ITS in your communities.
This document is one in a series of products designed to help you provide
ITS solutions that meet your local and regional transportation needs.
The series contains a variety of formats to communicate with people at
various levels within your organization and among your community stakeholders:
- Benefits Brochures let experienced community leaders explain
in their own words how specific ITS technologies have benefited their
areas;
- Cross-cutting Studies examine various ITS approaches that
can be taken to meet your community's goals;
- Case Studies provide in-depth coverage of specific approaches
taken in real-life communities across the United States; and
- Implementation Guides serve as "how to" manuals to
assist your project staff in the technical details of implementing ITS.
ITS has matured to the point that you are not alone as you move toward
deployment. We have gained experience and are committed to providing our
state and local partners with the knowledge they need to lead their communities
into the next century.
The inside back cover contains details on the documents in this series,
as well as sources to obtain additional information. We hope you find
these documents useful tools for making important transportation infrastructure
decisions.
Sincerely,
Jeffrey F. Paniati
Associate Administrator for Operations
Acting Program Manager, ITS Joint Program Office
Federal Highway Administration
Preface
This case study is one in a series of documents that examines the use
of Intelligent Transportation Systems (ITS) in work zones. More information
on this system and other applications of ITS in work zones is available
in the companion document, Intelligent Transportation Systems in Work
Zones — A Cross-Cutting Study (Report No. FHWA-OP-02-025,
EDL# 13600).
This case study reflects information gathered in interviews with key
personnel on the Big I construction project in Albuquerque, New Mexico,
as well as information and photos obtained during a site visit. The authors
greatly appreciate the cooperation of the New Mexico State Highway and
Transportation Department and its partners, who made the production of
this document possible.
Project and System Background
The New Mexico State Highway and Transportation Department (NMSHTD) rebuilt
the Big I interchange in Albuquerque to make it safer and more efficient
and to provide better access. The Big I is where the Coronado Interstate
(I-40) and the Pan American Freeway (I-25) intersect in Albuquerque.
The original Big I was designed to support an average daily traffic (ADT)
of only 40,000 vehicles and was severely over capacity, experiencing an
average of 1.7 crashes per day that were estimated to cost about $12 million
annually (data from 1999). ADT in the interchange was approximately 300,000
vehicles prior to its redesign; the redesigned Big I has a design capacity
of 400,000 ADT. The two-year project began on June 30, 2000 and involved
111 lane-miles of construction and 45 new and 10 rehabilitated bridges.
For the Big I project, NMSHTD employed ITS in the form of a mobile traffic
monitoring and management system to help move the large number of vehicles
through the extensive construction area. Mobile traffic monitoring and
management systems use electronics and communications equipment to monitor
traffic flow and provide delay and routing information to drivers and
agency personnel. The ITS application deployed at the Big I in 2000 was
used for the duration of the work zone (two years). The ITS components
were deployed just prior to construction, with plans to incorporate portions
of the system as part of a permanent ITS application for freeway management
once construction was completed. Figure 1 shows some of the ITS equipment
deployed at the Big I.
Figure 1 — Example of ITS equipment deployed
at the Big I.
NMSHTD used ITS for this major construction project for several reasons,
including:
- Changes in traffic patterns, nighttime closures, and pre-determined
alternate routes required that travelers be provided with high-quality
real-time information on travel route availability.
- The high volume of traffic moving through the Big I created great
potential for congestion. NMSHTD estimated that normal traffic volume
had to be reduced by at least 20 percent to keep traffic moving through
the Big I area. Incidents would create further congestion and require
rapid response to avoid additional delays. A system was needed to provide
accurate information, support quick identification of incidents, and
help manage traffic through the area.
The main goals of the ITS were:
- To provide traffic management capabilities and traveler information
on traffic routing, detours, and significant incidents.
- To minimize capacity restrictions due to incidents by more quickly
identifying incidents and determining an appropriate and effective response
to clear the roadway.
- To enhance traveler safety.
The Big I ITS included a series of cameras and sensors to monitor traffic
conditions and detect incidents, and electronic signs, highway advisory
radio (HAR), a website, and other media to transmit traveler information.
The incident detection capability was a major component of the system.
To effectively use the system information to expedite incident clearance,
NMSHTD made use of its motorist assistance program.
"ITS has been a very essential and integral
part of the Big I Construction Project."
— Rhonda Faught, Secretary, New Mexico State
Highway and Transportation Department
Figure 2 — Highway Emergency Lender Patrol Vehicle
Instituted prior to the Big I project, the Highway Emergency Lender Patrol
(HELP) program consisted of two vehicles patrolling the Albuquerque Metropolitan
area. NMSHTD recognized that the Big I project would require more HELP
trucks. The Federal Highway Administration provided $250,000 toward the
purchase of two additional HELP trucks. The additional vehicles were purchased
through the construction contract to help patrol the Big I project area
during construction. The original two HELP trucks were then able to patrol
the rest of the Metro area.
- The contractor was given (on a no-cost lease) two HELP vehicles
to operate Monday through Friday from 5:00 am to 8:00 pm to patrol the
work zone during construction.
- The HELP trucks are equipped with an air compressor, arrow board,
assorted tools and a truck-mounted attenuator
(see Figure 2).
- The HELP vehicles provided assistance to more than 10,000 stranded
motorists during the two years it took to rebuild the Big I.
- At the end of the Big I project, the HELP Trucks were turned over
to the NMSHTD for continued use.
Back to Top System Design, Selection, and Implementation
This section provides information on NMSHTD's experience in bringing
the system from the concept stage to fully operational.
In-House or Contractor Design
- NMSHTD used a design contractor for the Big I reconstruction project.
The design contract had a task for construction oversight that included
design and implementation of a work zone ITS.
- NMSHTD felt that it would be best to use a contractor with experience
in designing an ITS system for complex projects such as the intersection
of two large interstates.
System Selection and Procurement
- The design and construction oversight contract called for the purchase
and installation of all components of the ITS system as a lump sum purchase.
- The design contractor let a subcontract for the ITS system. The subcontractor
provided all system components, software and installation.
- Partial payments were made to the contractor as the system was deployed,
and for Cellular communication charges, but final acceptance and full
payment did not occur until the end of construction.
- NMSHTD assumed ownership of all components of the system at the end
of construction.
- The total cost of the ITS system was $1.5 million.
Lease Versus Purchase
- Some of the ITS work zone system components were designed to be part
of a permanent freeway management system after construction. Therefore,
the State decided to purchase the system components as opposed to leasing
them.
- Purchasing the system required greater capital costs early on, but
funding was available for this option.
- The design contractor purchased the system through their contract
for NMSHTD. The ITS system was purchased using construction oversight
funding.
System Implementation
- The design contractor provided a draft implementation/configuration
plan to NMSHTD that was based on their previous experience and tailored
to the characteristics of the Big I reconstruction project. NMSHTD staff
then reviewed and revised the implementation plan.
- The initial deployment phase lasted longer than anticipated due to
larger than expected variations in traffic volume during the system
calibration phase.
- The system took three and a half months to deploy from concept to
full installation and operation. Setup time included three days per
location to set up each VMS and camera, and half a day to set up each
portable Smart Zone.
Testing
- The system was designed to be portable and use wireless communication.
Wireless communication links were tested prior to the installation of
field elements to ensure adequate bandwidth availability.
- The complete system was brought online two weeks prior to the start
of construction. This allowed for thorough pre-construction testing.
Training
- The vendor trained NMSHTD employees on the use of the system and its
capabilities so that they would be able to continue to operate it in
the future.
- After the training, NMSHTD employees staffed the temporary Big I traffic
management center (TMC), with periodic consultation with the vendor.
Back to Top System Description and Operations
System Description
- The system consisted of eight cameras; eight modular (expandable)
dynamic message signs (DMSs); four arrow dynamic signs; four all-light
emitting diode (LED) portable DMS trailers; four portable traffic management
systems, which integrate cameras and DMS on one fully portable unit;
and four HAR units, all linked electronically to the temporary Big I
TMC.
- Components relied on solar re-chargeable systems for power (see
Figure 3).
- Communications equipment for the system included spread spectrum radio,
wireless Ethernet applications, and cellular digital packet data (CDPD)
modems.1
Figure 3 — Solar-Powered Sensors and Communication
Equipment
System Operations
- NMSHTD employees staffing the TMC monitored camera displays from 5:00
am to 8:00 pm, Monday through Friday to detect incidents
(see Figure 4).
- The staff were able to:
- Notify emergency personnel for dispatch.
- Post messages on electronic roadway signs.
- Provide traveler information to the public via the Internet and
a pager network.
The information provided was based on the incident type and severity.
Figure 4 — The Big I TMC System Description and
Operations
- NMSHTD also distributed information via a website, media outlets (radio,
newspaper, television), pagers (provided by a commercial paging service),
and fax and email distribution lists.
- Camera image data for the system were provided by electronic means,
and system components were connected via wireless infrastructure to
allow for data flow from the field to the TMC.
- The system software held a set of message scenarios for the electronic
roadway signs. Because the core of the Big I was entirely closed to
traffic most nights to facilitate roadwork, a whole series of detour
messages needed to be displayed each night. The ITS enabled TMC operators
to activate a pre-defined message scenario for all the DMSs with
"one click." These scenarios were not set to activate automatically,
although they could be. During incidents, NMSHTD could also manually
activate DMS messages indicating the accident location, lanes affected
and whether delays were occurring. The amount of delay and length of
queue were not displayed.
- The concept of operations diagram for the system is shown in Figure
5.
- The Big I website was updated regularly with new information. The
website displayed camera images in real-time and updated them automatically,
providing the public with current, timely information. NMSHTD manually
refreshed much of the other website content on a weekly basis.
D
Figure 5 — Albuquerque Work Zone ITS Concept
of Operations Diagram
"We have received scores of thank
you letters and emails from the public."
— Rhonda Faught, Secretary, New Mexico State
Highway and Transportation
Department regarding the Big I website, which provided the public with
real-time camera images.
Contractor or Agency Staff
- State agency staff operated the Big I ITS and its TMC.
- NMSHTD consulted subcontractor personnel on an "as-needed"
basis for assistance with technical issues. This assistance was provided
through the construction oversight task of the design contract.
Coordination with Key Personnel, the Public, and Other Agencies
- NMSHTD used a proactive traffic incident management approach. NMSHTD
staff developed a Crisis Communication Plan that delineated coordination
procedures to be followed, for various types of incidents, by key personnel,
the public, and other agencies as needed.
- Contact information posted on the project website allowed the public
to voice opinions on the functionality of the system and also identify
any problems.
- Faxes were sent out (at least weekly) to inform the media and other
agencies about road closures, detours, schedule changes, and major incidents.
- A police substation was located in the general contractor's staging
yard as shown in Figure 6, allowing for quick access and response to
the construction area. A police base station radio deployed at the TMC
allowed for direct communication between the police and NMSHTD staff.
A dispatcher was co-located in the TMC to dispatch the officers
as needed. An emergency medical technician (EMT) unit and a tow truck
were also located in the same compound as the police substation.
Maintenance
- NMSHTD performed periodic, as-needed maintenance on system components
with some initial help from the subcontractor.
- The subcontractor provided a warranty on all equipment for one year
from the date of purchase. However, NMSHTD needed to cover the maintenance
aspects of equipment problems and removal and installation of new parts.
Therefore, NMSHTD decided to purchase spare parts and perform maintenance
in-house.
Figure 6 — The Big I Police Substation in the
General Contractor's Staging Yard
Back to Top Results
System Performance
- The ITS construction TMC participated in about 500 incident responses
per month during construction.
- Incidents in the construction zone ranged from stalled vehicles to
multi-vehicle injury crashes.
- Visual coverage of the construction zone traffic resulted in average
response times of less than seven minutes with average clearance times
of less than 25 minutes.
- The system functioned properly approximately 95 percent of the time.
Operational issues were typically resolved within 48 hours of detection.
System Evaluation
- NMSHTD evaluated the ITS system through surveys of public perception,
and through the measurement of impacts on crash frequency and incident
response and clearance times. Results are noted below.
Benefits/Impacts
NMSHTD staff identified three major benefit areas resulting from the
Big I reconstruction project, which are listed below.
Mobility
- Incident response and clearance time was reduced from 45 minutes (historically)
to 25 minutes in the work zone with ITS.
- Approximate reduction in traffic as experienced from travel demand
management techniques (outreach, public communication, etc.) was 15
percent.
- Information provided by the system allowed NMSHTD to determine the
appropriate response for an incident, allowing the correct number of
emergency services and motorist assistance vehicles to be sent. This
both saved money and minimized the decrease in roadway capacity.
Safety
- A 32 percent reduction in crashes was observed during the first three
months of the work zone (compared to the previous year).
- Over the entire first year of the work zone, crashes were seven percent
higher than the previous year without the work zone. This increase was
smaller than what NMSHTD expected with the complexity of the work zone.
- The reduced incident response and clearance time is believed to have
resulted in a reduction in the frequency of secondary crashes. Other
motorists were less distracted by incidents, and "rubbernecking"
was reduced due to the shorter clearance time.
- Driver behavior observed using the system cameras allowed NMSHTD to
identify areas where drivers were having difficulty navigating the work
zone. This information was then used to make work zone configuration
changes to improve traffic flow.
Cost Savings
- Most nights the core of the Big I was closed to traffic, and detours
were activated. Daytime traffic patterns through the work zone also
changed frequently. The operator could activate pre-programmed
message scenarios with a few keystrokes without leaving the TMC. This
automation saved NMSHTD considerable effort in informing travelers of
changes in the work zone and detours.
- One person at the TMC could monitor work zone operations and disseminate
information to the public and incident response personnel.
- System information allowed police, fire and emergency personnel to
assess incident severity and send the correct number of vehicles. Thus,
costs were reduced, and other units were free to respond to other incidents.
Public Reception/ Reaction to the System
- NMSHTD administered over 1,000 surveys to assess the public's
perception of the Big I ITS.
- More than 60 percent of survey respondents were pleased with the accuracy
and timeliness of the public information provided.
- NMSHTD found that the use of the system lead to improved communication
and an improved relationship with the public.
Obstacles Encountered and Lessons Learned
General
- System Communications: Systems need to have reliable communications.
The communications network for an ITS application is vital to the operation
of the system and must be reliable. Issues that may impact communications
need to be addressed early in the system development and deployment
process.
- Start-Up Time: It is important to allow start-up
time when deploying a system. Problems will arise — such as with
sensor operation, communications (wireless or wireline), license applications,
component calibration, hardware, or software — and will take time
to address. NMSHTD found that a full service maintenance warranty would
be too expensive to be practical (on the order of $100,000), so they
invested the time to learn about maintenance of the system and performed
maintenance in-house.
- Building Public Awareness: It is important to use a proactive
approach in building public awareness of the project and the information
that the ITS application will provide. Successful techniques include
holding press conferences, issuing news releases, and keeping local
media (especially those the public turns to for traffic information)
up to date. NMSHTD used public meetings and outreach to reduce travel
demand during the work zone period.
- Accuracy of Information: It is vital to deliver accurate information
to the public. If inaccurate information is provided, the public can
quickly lose confidence and negative public relations result. NMSHTD
performed outreach to the public to help educate motorists and travelers
and for travel demand management.
- Interagency Coordination: Other stakeholder agencies, such
as those responsible for incident management, need to be involved early.
Coordination with other agencies is a primary issue that agencies should
consider both in developing and implementing an ITS work zone system.
NMSHTD coordinated extensively with the incident management community.
FHWA assistance for incident management was obtained to help patrol
the work zone area.
- Information Delivery: It is important to carefully consider
how to set up automated information delivery and sharing with other
agencies. It is possible to deliver too much information for agencies
to process effectively.
Planning and System Development
- Relating with Other Agencies: State departments of transportation
need to "sell" ITS to the incident management community and
work with them to determine how to use the system to coordinate with
incident response.
- System Features/Capabilities: Portability of the ITS units
is key in the core of the work zone because the work zone configuration
changes frequently, which may require that the units be moved.
Communications
- Communications Capacity: For CDPD communication, it is important
to ensure that the cellular provider has sufficient unused capacity
to eliminate communications failure during peak cell phone usage hours,
due to service overload.
System Deployment
- Start-Up: It is important to use a proactive approach
to building public awareness of the project and the information that
the ITS application will provide. Successful techniques include holding
press conferences, issuing news releases, and keeping local media up
to date.
- Access/Security: It is necessary to allow for access to sensor
stations for maintenance.
System Operations
- Use of System Information: When changes in work zone roadway
geometry are made, it is important to allow time for drivers to learn
the new traffic pattern before reporting problem spots to the contractor
based on observations from the system's cameras.
- Power Supply: Stations may need to be reset manually when there
are power interruptions, such as lightning storms.
- Maintenance: Maintenance needs can be met in-house, with
help initially from the vendor.
Back to Top Conclusion
The use of ITS for the Big I proved to be very successful in mitigating
the effects of construction on traffic mobility and safety. The NMSHTD
plan called for the use of ITS during construction, and also allowed some
of the system components to be made a permanent part of the freeway management
system for the Big I. This case study is one example of how ITS is being
implemented across the nation to help agencies better manage traffic while
performing necessary infrastructure improvements.
"I don't think that we could have
maintained the traffic flow we had through the Big I without the ITS."
— Rhonda Faught, Secretary, New Mexico State
Highway and Transportation Department
Back to Top
1 Note: CDPD is being phased out as most cell networks are
migrating to GPRS/GSM (General Packet Radio Service/Global System for
Mobile communications) digital.
Federal Highway Administration Resource Center Locations
Baltimore, MD
10 S. Howard Street
Suite 4000
Baltimore, MD 21201
Phone 410-962-0093
Atlanta, GA
61 Forsyth Street, SW
Suite 17T26
Atlanta, GA 30303-3104
Phone 404-562-3570
Olympia Fields, IL
19900 Governors Highway
Suite 301
Olympia Fields, IL 60461-1021
Phone 708-283-3500
San Francisco, CA
201 Mission Street
Suite 2100
San Francisco, CA 94105
Phone 415-744-3102
FHWA Metropolitan Offices
New York Metropolitan Office
1 Bowling Green, Room 428
New York, NY 10004-1415
Phone 212-668-2201
Philadelphia Metropolitan Office
1760 Market Street, Suite 510
Philadelphia, PA 19103-4124
Phone 215-656-7070
Chicago Metropolitan Office
200 West Adams Street, Suite 2410
Chicago, IL 60606-5232
Phone 312-886-1616
Los Angeles Metropolitan Office
201 North Figueroa, Suite 1460
Los Angeles, CA 90012
Phone 213-202-3950
Back to Top
This Document Is One in
a Series of Products That Address ITS Issues Pertinent to a Variety of
Audiences
- Elected and Appointed Officials
- Senior Decision Makers
- Transportation Managers
- Technical Experts
Representing:
- States
- Cities
- Counties
- Transit Properties
- Toll Authorities
- Emergency Service Providers
- Metropolitan Planning Organizations
- Additional Transportation Stakeholders
Products Available in This Series:
Benefits
Brochures quote how ITS technologies have benefited specific areas. |
Technical
Reports include results from various Field Operation Tests. |
Cross-Cutting
Studies present current data from related ITS applications. |
Implementation
Guides assist project staff in the technical details of implementing
ITS. |
Case
Studies provide in-depth coverage of ITS applications in specific
projects |
|
|
ITS Topics Addressed in This Series:
- Commercial Vehicle Operations
- Emergency Services
- Enabling Technologies
- Emissions Management
- Freeway and Arterial Management
- Highway Operations and Maintenance
- Planning and Integration
- Real-Time Traveler Information
- Transit, Toll, Traveler Information
- Weather Information for Travelers and Maintenance
- Work Zones
For a current listing of available documents, please visit our website
at:
www.its.dot.gov
Back to Top
Intelligent Transportation Systems
U.S. Department of Transportation
400 7th Street, SW
Washington, DC 20590
Federal Highway Administration
Room 3416, HOIT-01
Phone: (866) 367-7487
Facsimile: (202) 493-2027
FHWA-OP-04-072
EDL# 13941
|