Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation
A Guide for Analysts
Figure 11 Analytical Work Zone Decision Framework
A line graph. X axis is the level of detail from low to high. Y axis is resource availability from low to high. The graph is an S curve starting at the bottom left corner (low/low) and moving to the upper right corner (high/high). The S curve creates two sections. The upper left consists of modeling opportunities. The bottom right represents significant technical risk.
back