Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation
A Guide for Analysts
Figure 41 Yosemite Traffic Modeling Networks
Screenshot of QuickZone networks. Similar to Figure 40. This figure depicts two phases. On top is Phase 1 which has Southside Drive Closed and two way operations on Northside Drive. On the bottom is Phase 2 which has northside drive closed and two way operations on southside drive. Both networks came from QuickZone and have 12 nodes indicated.
back