Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation
A Guide for Analysts
Work Zone Analysis Scoping Worksheet
What key decision are you supporting? | |||
Work Zone Characteristics |
Agency Resources |
||
Type | I / II / III / IV |
Institutional | culture / leadership / data / contracting |
Network Configuration | isolated / pipe / grid |
Technical Staff | consultant / in-house |
Size | small / medium / large |
Funding | $$$$$$$$$$$$$ |
Analysis Area Dimension | site / local / metropolitan |
Time to Analyze | short / medium / long |
Performance Measures = Key Performance Mesure; = Secondary Performance Measure; = Not Important | |||||
Travel Time | Volume | ||||
Delay | User Cost | ||||
Queue Length | Incidents | ||||
Speed | Cummulative Impacts | ||||
Precision of Results |
rough estimation |
detailed assessment |
Data | |||
Availability |
Notes | ||
Type | Roadway Characteristics | ||
Travel Demand Characteristics | |||
Cost Attributes | |||
Source | Primary | ||
Archived | |||
Quality | Collection Frequency | ||
Geographic Coverage | |||
Archive Length | |||
Accuracy |
Transportation Management Plan Strategies = Key TMP Strategy; = Minor TMP Strategy; = TMP Strategy Not Considered | |||||||||||||||
Temporary Traffic Control
|
Public Information
|
Transportation Operations
|
|||||||||||||
Control Strategies
|
Traffic Control Devices
|
Project Innovation
|
Motorist Information
|
Demand Mgmt Strategies
|
Corridor/Network Mgmt Strategies
|
Work Zone Safety Mgmt
|
Traffic/Incident Management
|
||||||||
Construction Phasin/Staging
|
Changeable message signs
|
Project Coordination
|
Changeable message signs
|
Transit service improvements
|
Signal timing/coordiantion
|
Speed limit reduction/variable speed limits
|
ITS for traffic monitoring
|
||||||||
Full roadway closure |
flaggers and uniformed traffic control officers |
Contracting Strategies |
Dynamic speed message sign |
high-occupancy vehicles lanes |
Temp. traffic signals |
Temporary traffic signals |
Transportation management center |
||||||||
Lane shifts or closures |
Temporary traffic signals |
Innovative construction techniques |
511 traveler information systems |
Toll/congestion pricing |
Street/intersection improvements |
Tow/freeway service |
|||||||||
one-way, two way operations |
Ramp Metering |
Bus turnouts |
Local detour routes |
||||||||||||
two-way traffic on one side of divided facility |
Turn restrictions |
||||||||||||||
Reversible lanes |
Separate truck lanes |
||||||||||||||
Ramp closures/relocation |
Reversible lanes |
||||||||||||||
Freeway-to-freeway interchange closures |
Ramp metering |
||||||||||||||
Night work |
Temporary suspension of ramp metering |
||||||||||||||
Weekend work |
Ramp closures |
||||||||||||||
Work hour restrictions for peak travel |
Coordination with adjacent construction sites |
||||||||||||||
Off-site detours/use of alterante routes |