Smartzone
- What is a Smartzone?
- How does it work?
- How much does it cost?
- What are the measurable results?
Slide 4
What is a Smartzone?
Smartzones provide the motoring public automated, real time, traffic information in workzones
Slide 5
How does it work?
Smartzones incorporate roadside speed and volume sensors to detect delay/congestion.
This information is then transmitted to an on-site computer via radio, cellular or satellite for processing.
Delay information is then transmitted from the computer to portable Changeable Message Signs.
Slide 6
How much does it cost?
Depends on how much equipment is necessary to provide the required monitoring and duration of project.
Depends on the type of communication technology that is required ( i.e. radio versus cellular and satellite).
Depends on the complexity of the individual vendors system ( i.e. software cost, communication costs, etc).
Slide 7
What are the measurable results?
Reduction of Congestion associated with lane closures.
Reduction/elimination of "rear end" crashes due to excessive queuing.
Reduction/elimination of Fatal Crashes due to excessive queuing.
Increased Productivity for the Contractor.
Slide 8
Intangible Factors
Improved Communication with the Motoring Public resulting in a more positive Department Image.
Real time, credible information resulting in better compliance with workzone information.
Slide 9
I-95 Deployment
System Requirements
- 6 speed sensors
- 8 Changeable Message Signs (2 used on Alternate Route)
- 6 cameras (w/ Pan/Tilt/Zoom)
- 1 Command Center
- 1 Laptop Computer
- Project Website
Slide 10
I-95 Smartzone Deployment
Workzone is located at Milepost 58 just north of Fayetteville, N.C.
Surveillance Area: I-95 between Milepost 46 and Milepost 73 in Cumberland and Harnett Counties
Preselected Alternate Route: US 301.
Northbound Exit 55
Southbound Exits 61 and 65
Slide 11
I-95 Smartzone Deployment
Contract Information
I. Contract had 3 pay items
- Mobilization
- Monthly Rental
- Remobilization
II. Department Guaranteed 4 months usage with a maximum 10 month duration
Slide 12
I-95 Smartzone Deployment
- Successful Bidder was the Scientex Corporation
- Mobilization = $75,000
- Monthly Rental = $15,000
- Remobilization = $10,000
Total Bid = $235,000
Current expenditure = $135,000. The SMARTZONE equipment is currently being demobilized due to lane closure phase of project is completed
Slide 13
Traffic !@$%
Photo: Image of two-lane highway with heavy traffic congestion.
Slide 14
Project Website
www.i95fayetteville.com
Photo: Screen shot of www.i95fayettteville.com. A traffic map of I-95 is shown with intermittent CMS stations. A caption is shown at CMS 1 that reads "No Delay Next 4 Miles Sep 10 3:22 PM."
Speaker notes:
Our Mission:
To serve the public by providing the safest, most efficient, and most economical Traffic Control, Pavement Marking, and Roadway Delineation Plan Package in accordance with federal and state guidelines for all utility, maintenance, and transportation improvement projects.
Slide 15
Devices
Photo: Camera trailer with communication satellite on the side of a highway
Camera trailer with Satellite communication
Note: Cameras not needed for system operation. Department Observation Purposes Only
Slide 16
Smartzone Devices
Solar Powered CMS with RTMS and Speed Sensor
Camera
Speed Sensor
Photos: Images depicting a Solar Powered CMS with RTMS, a Speed Sensor, and a Camera
Slide 17
Smartzone-RTMS Sensor
Photo: Image depicting RTMS Sensor
Slide 18
Command Center
Photo: Image depicting Command Center: a desktop computer and monitor with a traffic information map pictured on the screen.
Slide 19
Smartzone Communications
Photo: Communications antenna
Slide 20
Smartzone Communications
Photo: Roadside Remote Station
Slide 21
Real Time Information
Photo: Image of CMS on the side of the highway displaying traffic information: "SLOW TRAFFIC AHEAD"
Speaker notes:
- When we look at personel we consider
Slide 22
Real Time Information
Photo: Image of CMS on the side of the highway displaying traffic information: "12 MIN DELAY AHEAD"
Slide 23
Real Time Information
Photo: Image of CMS on the side of the highway displaying traffic information: "JUL 16 2:21 PM"
Slide 24
Real Time Information
Photo: Image of CMS on the side of the highway displaying traffic information: "ALT ROUTE EXIT 65"
Speaker notes:
- postive protection/separation
- use barrier, temporary guardrail, and temporary asphalt islands
- barrier & temporary guardrail is used to protect motorists, dot personnel and contgractor’s personnel from construction operations
- use barrier to separate traffic and workers
Slide 25
Real Time Information
Photo: Image of CMS on the side of the highway displaying traffic information: "20 MIN DELAY AHEAD"
Speaker notes:
- be innovative to meet the demands of the project location
- system is state owned & reusable
Slide 26
Real Time Information
Photo: Image of CMS on the side of the highway displaying traffic information: "ALT ROUTE EXIT 61"
Slide 27
I-95 Smartzone Results
Since deployment, traffic queues have been reduced on average to 2 miles or less. Before deployment, queues were exceeding 5 miles
No recorded "rear end" crashes and no Fatalities
Delay information was accurate
Some utilization of alternate routes
A lot of positive response from media and motorists
Slide 28
News and Observer Article
July 2, 2002
Traffic warnings make I-95 cool
By Vicki Hyman
Until now, I've never found cause to string together the words "North Carolina Department of Transportation" with "cool." The state has installed its first "smart work zone" on Interstate 95 outside Fayetteville, equipping the highway with sensors to detect speed, calculate traffic conditions and relay real time information to electronic message boards and a Web site.
I'm not talking messages like "Delays Ahead" or "Expect Congestion" that you might see on I-40 around rush hour. With all due respect to the technicians who spend hours monitoring traffic conditions via live feeds from cameras posted along the highway, let me just say, "No duh."
The messages posted on I-95 can tell drivers to the minute, how long a delay to expect.
Once the delay reaches 10 minutes, the electronic message boards offer alternate route information. The state has placed the message boards far enough ahead of the backups to give drivers a way out before they actually hit the traffic.
On the Web site,
http://www.I95fayetteville.com, you can even view how fast traffic is moving through the work zone.
Slide 29
I-95 Smartzone Problems
Downtime due to equipment malfunction
Under-powered camera/sensor equipment
Communication problems with cameras. Had to utilize satellite communications
Availability of speed, volume and video information
Slide 30
Future Changes
Utilize "on-site" technician
Improve Departments access to speed, volume and video information via the website
Utilize pay reduction for system downtime
Have system notify (via Page, email, cell phone) appropriate personnel if a malfunctions occurs
Improve messages on CMS's to enhance ridership on the Alternate Routes
Slide 31
Success?
You bet!
The NCDOT is very impressed with the available technology and is currently in the process of installing 2 more ' Smartzones' on I-95
Slide 32
So far. what we think we know
Smartzone "AIN'T" a substitute for sound engineering
Smartzones work well on rural interstates with AADT's up to 55,000 with available alternate routes that have a high frequency of lane closures
Smartzones may have applications on roadways with higher AADT's (55,000 to 65,000) where we traditionally restrict lane closures to nightly activity
Smartzones have limited applications on high volume roadways (above 65,000) with few reasonable alternate routes
Interstate Rehabilitation Projects are the best candidates for SMARTZONE installations due to the frequency of lane closures
Slide 33
Smartzone Configuration
Diagram: Diagram is illegible and cannot be interpreted.
Slide 34
US 301 Alternate Route
Diagram is illegible and cannot be interpreted.