The Microsoft Word version of this checklist is an editable form that can be used to support process reviews.
Process Checklist | ||||
Are all the bases covered? | Yes | No | Not Applicable | Comments |
Are integration activities included in the master project schedule? | ||||
Does the plan for integration and verification support the strategy for deployment? | ||||
Based on project complexity, is a written Integration Plan required? | ||||
Are the external systems needed to support integration available, or does the interface need to be simulated? | ||||
Have the components to be integrated been placed under configuration control? | ||||
Are the development teams available to promptly fix problems uncovered during integration? | ||||
Was a Verification Plan developed and approved? | ||||
Were all requirements traced to a Verification Plan test case? | ||||
Were Verification Procedures developed and approved? | ||||
Were the key participants identified and trained? | ||||
Were all resources needed for testing in-place? | ||||
Were all participants notified of the testing schedule? | ||||
Was a Verification Report prepared? |