QuickZone Case Studies: The Application of QuickZone in Eight Common Construction Projects
Federal Highway Administration
1200 New Jersey Avenue SE
Washington, DC 20590
FHWA-HOP-09-054
October 2004
Printable Version [PDF 1.12MB]
You will need the Adobe Reader to view this PDF.
Contact Information: WorkZoneFeedback@dot.gov
Table of Contents
Technical Report Documentation Page
1.1 QuickZone 1.0
1.2 QuickZone Partnership Program
1.3 Case Study Overview
2.1 Knoxville, Tennessee: I-40
2.2 Maryland/Virginia Woodrow Wilson Bridge: I-95
3.1 Little Bras d'Or Bridge: Nova Scotia, Canada
3.2 Reeves Street: Nova Scotia, Canada
6.1 Pennsylvania I-80
6.2 Virginia Calibration Sites
6.3 ITS Technology Assessment
6.4 Other Nova Scotia Projects
List of Figures
Figure 1.1 – Geographic Distribution of QuickZone Sales and Case Study Location
Figure 2.1.1 – Knoxville, TN
Figure 2.1.2 – Knoxville, TN QuickZone Network
Figure 2.2.1 – Woodrow Wilson Bridge Construction Diagram
Figure 2.2.2 – Woodrow Wilson Bridge QuickZone Network
Figure 3.1.1 – Little Bras d'Or Bridge QuickZone Network
Figure 3.2.1 – Port Hawkesbury, NS
Figure 3.2.2 – Reeves Street QuickZone Network
Figure 3.2.3 – Reeves Street Intersection
Figure 4.1.1 – Yosemite Case Study Area
Figure 4.1.2 – Yosemite QuickZone Network
Figure 4.1.3 – 2004 Hourly Demand Pattern By Day of Week (from HI-STAR)
Figure 4.2.1 – Zion National Park QuickZone Network
Figure 5.1.1 – Beartooth Highway Location
Figure 5.1.2 – Beartooth Highway QuickZone Network
Figure 5.2.1 – Louis Lake Road QuickZone Network
List of Tables
Table 1.1 – Case Study Comparison Matrix
next