Technical Report Documentation Page
1. Report No. FHWA-HOP-09-054 |
2. Government Accession No. |
3. Recipient's Catalog No. |
|
4. Title and Subtitle QuickZone Case Studies "The Application of QuickZone in Eight Common Construction Projects" |
5. Report Date October 2004 |
||
6. Performing Organization Code |
|||
7. Author(s) Mitretek Systems |
8. Performing Organization Report No. |
||
9. Performing Organization Name and Address Mitretek Systems |
10. Work Unit No. (TRAIS)
|
||
11. Contract or Grant No.
|
|||
12. Sponsoring Agency Name and Address U.S. Department of Transportation |
13. Type of Report and Period Covered
|
||
14. Sponsoring Agency Code
|
|||
15. Supplementary Notes
|
|||
16. Abstract QuickZone is a spreadsheet-based analytic tool that allows for quick estimation of work zone delay and can be used to support decisionmaking during all phases of the project development process (policy, planning, design and operations). FHWA commissioned a series of QuickZone case studies to capture the uses and impact of the tool. The case studies contained herein are a few examples of the many applications of QuickZone. The eight highway construction project sites presented in the case studies are intended to showcase a range of applications, plus to highlight innovative modeling approaches using QuickZone. The case studies are located throughout the United States and Canada and include urban and rural applications. The roadway facilities include both high-volume, freeway applications with recurring congestion and low-volume, rural road applications where congestion is rarely a problem. |
|||
17. Key Words QuickZone, traffic analysis tool, work zone, delay, highway construction |
18. Distribution Statement No restrictions |
||
19. Security Classification (of this report) Unclassified |
20. Security Classification (of this page) Unclassified |
21. No of Pages 58 |
22. Price
|
Form DOT F 1700.7 (8-72)
Reproduction of completed page authorized.
previous | next